INSIDER
What’s next? Update on 59/610 Interchange project
Read full article: What’s next? Update on 59/610 Interchange projectThe Texas Department of Transportation is completing milestone after milestone on the I-69/I-610 interchange project, but they’ve still got a couple of years left before the work is complete.
KPRC 2 Traffic Exclusive: Here is when the 59/610 connector ramps in the Galleria area will be fully open
Read full article: KPRC 2 Traffic Exclusive: Here is when the 59/610 connector ramps in the Galleria area will be fully openThis is the busiest interchange in Texas, with more than 250,000 vehicles traveling through 59 and 610 a day! Major work has been underway for quite some time now, and TxDOT’s most recent accomplishment: opening the connector ramps that lead drivers into the Galleria area. These connector ramps were supposed to be shut down for six to eight months, when they first closed during the summer.
Good news, drivers: 59/610 connector ramps opening sooner than expected
Read full article: Good news, drivers: 59/610 connector ramps opening sooner than expectedIt’s been a couple of months since the Texas Department of Transportation shut down two major connectors ramps of the 69/610 interchange. So how much work have crews been able to get done since the shutdown?